Time: 1 Hour
With the primer dry I started to do a little assembling. Then I noticed a step that must have skipped over in my match drilling. The 4 holes that allow the HS-411 bearing/hinge to be bolted to the HS-609 stiffener and the HS-603 did not get drilled out to a #12! Oops, not a big deal, and I just did that step now. Then I deburred those holes and primed them. I’m waiting for a 1/8″ flush set and a modified 1/8 cup set from Avery Tools so that I can squeeze the rivets on these pieces. Hopefully they will be here by the weekend so I can get some riveting done.