Skip to content

RV8-Hangar

Follow my Journey of building a Vans RV-8 Aircraft

Menu

Primary menu

  • About Me
  • Latest Progress
  • Fuselage
  • Wings
  • Empennage
  • Engine
  • Contact

Tag Archives: vans aircraft

BraveHearts Fly-Over

Posted on September 13, 2021 by Michael — No Comments ↓

We did a fly-over for a charity event hosted by the Rock Valley Mustang Club supporting veterans through the BraveHearts riding therapy.

Visit them at: https://braveheartsriding.org

Posted in Flying | Tagged vans aircraft, vans rv8 | Leave a reply

Primary Sidebar Widget Area

Bose A20 Review

  • Bose A20's Unboxing

Aircraft Hobbs Meter

12/27/2021 – 158.4

RV-8 Build Began:

  • Build Began:
    10 years, 0 months, 20 days ago

Website Visitors 2023

23,095

My Build Hobbs Meter

Total Time – 1938 Hours

Empennage Total – 218 Hours
Horizontal Stabilizer – 83 Hours
Elevators – 53 Hours
Vertical Stabilizer – 22 Hours
Rudder – 37 Hours
Fiberglass – 23 Hours

Wings Total – 536 Hours
Wing Structure – 216 Hours
Fuel Tanks – 135 Hours
Ailerons – 53 Hours
Flaps – 42 Hours
Wiring – 11 Hours
Fiberglass – 56 Hours
General – 23 Hours

Fuselage Total – 1184 Hours
Canopy – 124 Hours
Engine: 115 Hours
Cowl – 64 Hours
Firewall – 62 Hours
Firewall Forward – 16 Hours
Forward Section – 285 Hours
Center Section – 57 Hours
Seat Substructure – 27 Hours
Mid Fuselage – 131 Hours
Aft Fuselage – 190 Hours
Wiring – 113 Hours

Recent Posts

  • We still need your VOTE! October 11, 2022
  • Aviation Scholarship October 7, 2022
  • Not about the RV but just as cool! September 13, 2022

My Logbook

Footer menu

  • About Me
  • Latest Progress
  • Fuselage
  • Wings
  • Empennage
  • Engine
  • Contact
  • Twitter
Copyright © 2023 RV8-Hangar. All Rights Reserved.
Theme: Catch Box by Catch Themes
Scroll Up