Good Weekend

Had a good weekend in the Hangar. Got the final bits and pieces done with trim work. Finished in boxing some of the required tools and figuring where they should go. Here is a panorama view of the Hangar.

20130218-102941.jpg
One of the tools I was looking forward to unboxing is the DRDT-2. It is a dimpling machine that will allow me to dimple large items like skins. Now just trying to decide if I want to sacrifice some floor space and have a dedicated table for dimpling.

20130218-103205.jpg

20130218-103212.jpg

I added a cord reel to give me easy access to electricity and moved the Miller welder into its place.

20130218-103427.jpg

20130218-103627.jpg

EAA Work Bench

Got a little work done today, constructing my main work bench. I used the plans from EAA(Experimental Aircraft Assoc.) which I modified a little to better fight the Hangar. It’s 5′ x 3′ and 34.5″ tall. I planned it out so that when not in use it will slide under the open counter allowing for more parking space. Now all I need is the plywood top and shelve and I will have a sturdy work surface.
20130205-210251.jpg20130205-210339.jpg20130205-210346.jpg20130205-210353.jpg20130205-210401.jpg

20130205-210419.jpg

20130205-210412.jpg

20130205-210426.jpg

20130205-210450.jpg

20130205-210456.jpg

20130207-213438.jpg

Base Cabinets

A little more progress on the Hangar. My father fell ill in California recently so my work came to a halt. I was home this weekend and got a chance to do a little work. I’m so close to being able to rivet I can taste it! Base cabinets are in and I’m working on the countertop. I decided to use 3/4″ plywood as a base and 3/4″ MDF as the top. That will give me a solid top and it will be easy to replace the MDF when it gets worn down. I left a 5’6″ gap open on the long wall for me to roll my EAA workbench under when not in use. I decided a 3’x5′ workbench was as large as I could go, I think it should work fine based on the research I have done.

20130123-163109.jpg

20130123-163142.jpg

20130123-163148.jpg

20130123-163155.jpg

20130123-163203.jpg

Upper Cabinets Done

I finished up the upper cabinets this afternoon. I was able to install my LED TV too, figured this would be easier before I get the base cabinets installed. As much time as I will be spending in the Hangar I figured a TV would be a nice touch. I ran a HDMI cable from my AV equipment and will split the output from my cable box mirroring my living room TV.

20130107-195719.jpg

20130107-195727.jpg

20130107-195734.jpg