Empennage Fairing

Time: 4 Hours

While I was waiting for fiberglass to dry on the canopy skirts I worked on the empanada sharing over a few days. Basically just consisted of filling with epoxy and micro and sanding filling and sanding filling and sanding too I got to the perfect shape that I wanted. I used a filler primer to find all the pinholes, the voids left by air bubbles in the fiberglass epoxy, so that I could fill those which seems like a never ending process.


After filling 90% of the pinholes I primed and put into place. I will do some more finish work on this later down the road prior to painting.

As you can see it has a nice tight gaps all the way around and only a few screws to hold it in place which prevents the faring from puckering. I’m very happy with how this turned out and I can’t wait to see how it looks once painted!

More Canopy Skirt Work

Time: 4 Hours

So I removed the left skirt after making the cuts and still had major shape issues. After scratching my head and asking for Glenn’s advice he noticed that the bend at the top edge of the skirt was up a 1/4″ higher than the right side where the meet the canopy. Wow how did I miss that? So off it came and I filled in all the holes I drilled with micro and waited a day to sand them flush. 


Then back on the skirt went but this time in the correct orientation. The fit was much better! Closing the gap in the backend quite a bit. So one problem is now solved and onto the next aft end. The shape was terrible and I just couldn’t get all edges to fit at the same time. So what to do? Glenn says start cutting off a little at a time to you do get a good fit and rebuild what you cut off. So you can see I had to chop a good amount off which scared me since I have very little experience with fiberglass.so to rebuild I needed a bridge to give shape to the initial lay up in this area. I used a file folder cut into the shape to fit into the space and covered it with packing tape so that fiberglass would not stick.I made a tunnel/cover for the slider rail you can see out of sheet aluminum shaped and sized to fit just over the rail. This will allow for the skirt to slide over the rail when closed. I covered all the rest of the surfaces with packing tap and started the layup. I placed one layer of heavy cloth underneath both edges of the pink skirt and three layers in between the two edges of the pink skirt for my first lay up. When I came back the next day I found that the layup wasn’t perfect and had a large gap at the top where it met the canopy. Probably due to the black tape not holding down the skirt as tight as it should have. So I removed the entire skirt and cut it in half on the new layup. I removed a little bit from each side so that I could lay it down tight against the canopy and the gap would close. Now that I had it in a tight position against the canopy I did another new layup to close this gap.At the same time I started using some micro to build up the transition between the pink and the new on the edges for a start.


Boy does this look rough! And it’s gonna take a lot of work I think. When I came back the next day I sanded down the edges to get a close shape and cut off the extra then covered the entire surface with micro so that I could start the shaping process. 


More to come on this project. This process takes a lot of time in between work so you can let each step dry before continuing. 

Canopy Skirts Started

Time: 6 hours

I started the process of installing the canopy skirts. These come in to halfs that will eventually get mated at the aft end. They come in a rough size and need to be trimmed down to a scribe line they put in them. I started with my cut 1/4″ from the line to give me some working room. 


I grabbed my Dremel and cut to the line and created a lot of dust! Before I can mount them to the canopy frame I need to make reference lines for the holes in the canopy. These lines, 2 per hole, will intersect at the hole center. 

Then you put the skirt in place sliding it forward and aft until you find the sweet spot as Glenn called. Once that’s found you tape it in place so that you can transfer the lines you just drew. 


I started at the front and worked aft clecko’ing as I went. This is backwards from the plans but I have read others have done the same since the aft end is the hardest to get done and usually requires modification. I used the triangle shaped templates to drill the frame ribs. One side on and one to go. 

I had to do a initial trim of the aft end to get them to layup somewhat close. 

I’ll work on the aft end a little later for now I need to work the sides a little. First this is to mark the final edge cut now that I know where the rivet holes are.


 I’m glad I left 1/4″ extra since there was an area on both sides in the back end that was right at the needed distance and didn’t require any extra cutting. Once I had the edge marked I cut it off with the Dremel and sanded the edges to get a nice straight edge. The desire is to have the lower edge nice and tight to the fuselage skin. Both sides have a little gap at the bend where it turns up. 

To fix this problem I will make slot cuts in the fiberglass vertically to relieve the stress and allow me to bend down flush against the fuselage. I placed packing tape all over the fuselage under the area that needed fixed to prevent the epoxy from sticking. Then I marked where I thought the cuts needed to be. 

I cut the slots then prepped the area for some fiberglass. I cut some squares of medium fiberglass cloth to cover the gaps I just cut. With the skirt off and upside down I wetted the cloth peices and put them over the slots. Then I put the skirts back on the frame with it slid back a little. Then I slid the canopy forward so that it set in its closed position. The sides are able to easily be pushed down flush with the fuselage and held there with some gorilla tape. 

When this dries I will remove the black tape and fill the slots on the exterior with epoxy and micro. Then I will put another layer of cloth inside and a lightweight layer on the exterior to strengthen this area. So I couldn’t move the canopy as this dries so I called it a day. I will repeat this process for the right side tomorrow. After these are done I will attempt to build the aft end and join the to halfs. 

Canopy Inside Handle

Time: 3 Hours

The stock canopy handle for the inside of the canopy frame is not the best looking design in my opinion. I’m taking another page out of Glenn’s playbook with a little twist. Glenn cut off the handle part and added a black ball as a hand hold. I like the basic idea but wanted my handle to match the pilot and passenger throttles. They both have nice anodized handles, the passengers being a little smaller, and I thought that the smaller one would look good. So I cut off the stock handle at the lower end and left a short peice of the top part of the handle. 

You can see the black line that marks the lower cut. Once I made that cut I left the short peice on the other end. This left a welded tube for me to work with. It was too big for an AN-3 bolt so I made an insert out of aluminum tube that had an ID for an AN-3 bolt. I had to sand it down to get the OD to fit the handle tube. I used this homemade bushing to drill the back of the handle. From there I was able to bolt the handle to the bracket. 

I took it apart and cleaned and primed it followed by a couple of layers of paint. It didn’t take too long for me to realize that this setup wouldn’t work! There is another peice that acts a hook that slides over the circular stem you see in the above photo. As the handle is turned the hook pivots at the screw hole and rotates to pull the hook. As it does it slides by the flat part of the handle. In the setup I came up with the nut would hit the hook as there is only about a 1/16″ space. So back to the drawing board. What I came up with is to weld a threaded stand off, fro McMaster Carr,  to the handle so that I could just screw the handle into it and not need a nut. So I cut off the remaining portion of the handle and cleaned up the flat part with my angle grinder. Since I drilled a hole for the original bolt I figured I would put it to use to hold the stand off from the back side as I weld. 


After I welde the parts I cleaned them up with my grinder and Dremel. I then primed the parts to prepare of another atempt of painting. 

I decided that despite me owing a small angle grinder and have taken a few classes with my brothers, my welding skills are a little rusty. I mixed up a little epoxy and micro to clean up the look of the welded joint. After that dried I primed and painted the handle. Now you can see the issue I would have had with the nut in the last setup.



The hook will get trimmed to match the canopy when I’m all done with it so that it securely hooks and holds the canopy frame closed.

Canopy Riveted (Temporarily)

Time: 1 Hour

I spent just an hour finishing up the edges and prepping to temporarily rivet the canopy to the frame using the 15 keeper holes that I had drilled. These rivets are flush and hold the canopy in place while you work on the canopy skirts. When that work is done you drill these rivets out and remove the canopy so that you can clean the holes and prime/paint the frame if you desire.  Making sure I had the correct AACQ soft blind rivets that the plans called for I took a very deep breath and went to it. Each one I said “please no cracks” and pulled away. I’m happy to say all went well and no cracks!



Ok so now on to the skirts!