Bottom Inboard Skins Started

Time: 3 Hours

I decided to get some work done in the Hangar today, my home schedule has been pretty busy with flying and spending time with my girl since she is in town for an expo downtown Chicago. My next big task is to get the inboard bottom wing skins riveted on. I have been dreading this task as it is very hard to get inside the wing to buck the rivets. Before I could start I needed to scarf the joint where the inboard and outboard skins overlap just as I did for the top skins. I’m working on the left wing today as I knew that trying to get both wings done would be nearly impossible lay the same time.

20140520-133022-48622188.jpgOnce I was happy with the overlap I checko’ed the skin to the rear spar and no where else. I need to be able to lift up the skin at the forward end to slip my hand and bucking bar all the way into the wing to get to the rear spar rivets. This is a lot of work and very difficult especially between the wing walk ribs. I worked from inboard to outboard on the rear spar rivets until I was outboard of the last wing walk rib. I then went back and went aft along the second inboard rib (the first I will get with the squeezer later) for 4 rivets. I moved to the next rib outboard and went down 2 rivets. Moving back to the first rib I added 2 more rivets followed by 2 more on the 3rd rib. I then went to the 4th rib and did 2 rivets. Can you see the pattern? I was stepping the rivets as I worked outboard. It took me 1 hour to get 43 rivets done as this is very difficult. I have to use a mirror and flashlight just to inspect the quality. I have had to drill out 2 so far as I let the bucking bar slip I guess.

20140520-133706-49026856.jpgI finished up all the wing walk ribs and decided that I would stop there. I had a meeting to attend then off to dinner downtown with my girl. I have read that these rivets take a while since they are so hard and I don’t want to push it. The rest if the week and weekend will be shot for hangar work as it is the Memorial Day weekend. After that I will get back hard at it.

20140520-141100-51060442.jpg

Flaps Drilled

Time: 5 Hours

Today’s task was to get both flaps drilled to the wings. If you remember that I left the wing side of the flap hinge undrilled so that I could make any adjustments so the trailing edges of the ailerons/flaps aligned. This was the time for me to get everything aligned so I could drill the hinges. There are several areas that I had to work with. One was to keep a 1/4″ gap between the flap and aileron. Another was to keep the trailing edges of the flap and aileron straight with each other as they run from inboard to outboard. The other was to make sure I didn’t run out of edge distance on the hinge flange as I made these adjustments. I have read many builders websites where they come close to the edge distance problem. Van’s calls for a 3/16″ edge distance minimum. Edge distance is measure from the center of the rivet hole to the edge of the hole. So I drew a line on the hinge to represent my line I can’t cross for reference.

20140516-133243.jpgI then used my 2 spring clamps to attach the flap to the wing.

20140516-133335.jpg

20140516-133343.jpgI then spent an hour fine tuning all the angles and edges until I was perfectly happy with all the alignments and drilled one hole at the outboard end and clecko’d it in place. I then rechecked all the alignments and when I was happy I drilled the inboard hole and clecko’d it as well. I rechecked all the alignments once again and when I was happy I worked my way down the line drilling a hole and cleckoing it until I had all the holes complete.

20140516-133742.jpg

20140516-133747.jpg

20140516-133754.jpgI removed the flap and the hinge and was happy to see that I was good on all my edge distances! As with all the steps on this plane the second time goes a little faster. I had lefts side done in about half the time as the right. On the right flap the inboard edge, closest to the aileron was the side that needed to be lifted or moved aft in order to get the alignment just right. To opposite was true of the left wing. I’m guessing this is normal and this is why they use this process to remove any inconsistencies in the trailing edges. This hinge is on the bottom of the wing and no one will see it so symmetry between the wings is not necessary. All in all it was a fun day in the Hangar and had a little head scratching at times.

Rods Finished

Time: 4 Hours

I forgot to post my work from yesterday so at lunch today I figured I better finish this write up. I had plenty of work to do around the house to get it cleaned up as my girl was arriving for a show that she is working in Chicago. When I got done with that I got a few hours in before having to go get her at the O’Hare airport. First task was to prime the long pushrods before I could rivet them.

20140516-125614.jpgWhile those were drying I turned my attention to riveting the smaller rods. They have 2 rivets per end at 90° to each other. Van’s calls for AN470-12 rivets here which are pretty long. I have read where other builders have had problems with the tail tipping over during the squeezing of these. They recommended going down a size to a -11 which is what I did. You have to go slow and control the squeeze as it’s real easy to tip them over. I know this as I did it to two of them! Good thing that drilling them out was not a big deal as the rod pieces are steel and don’t enlarge very easy. Taking my time proved to be the key to successes.

20140516-130125.jpg

20140516-130131.jpgWith both rods riveted I screwed on the end bearings and adjusted them to the required length as labeled on the plans. I then attached one end to the aileron bracket and the other to the bell crank.

20140516-130416.jpg

20140516-130425.jpgNow was the time to get the aileron in alignment so that it is a neutral position with reference to the wing structure. Two tasks you need to do to complete this. The first is to get the bell crank in a neutral position. To do this Van’s gives you a jig that has a hole that lines up this the bolt used to hole the small rod to the bell crank. When the flat side of the jig is flush with the main spar and the bolt is through the hole then the bell crank is in neutral position.

20140516-130855.jpg

20140516-130901.jpgNow that we have the bell crank set neutral the aileron trailing edge should be in the neutral position as well. To check this we use 2 of the tooling holes that are in the outboard wing ribs. You drill a hole for and AN3 bolt in both spots on some straight edge, I used a 42″ aluminum ruler. Then drawing a line on the top of those 2 holes as well as the bottom. This gives you 2 parallel lines from the two holes extended to the end of your straight edge. The aileron will be centered between these two lines when in neutral position. If they are outside of the lines the. You just make the required adjustments to the rod ends to get it centered.

20140516-131403.jpg

20140516-131411.jpg

20140516-131416.jpgI repeated this process on the other aileron and now have them aligned neutral when the bell crank is neutral. The last item I did was to blind rivet the ends on the longer push rods after the primer was dry.

20140516-131601.jpg

20140516-131606.jpg

Ailerons Mounted and Push Rods Started

Time: 5 Hours

Now that the flaps are done I needed to start to assembly of the control surfaces onto the wings. First item was to mount the aileron bell cranks to the main spars. These bell cranks transfer the motion from the control stick in the fuselage 90° towards aft and the ailerons. They are powder coated steel and rotate around a brass bushing.

20140514-172110.jpgI first cleaned up the top and bottom of the bell crank tube where the bushing slides into. I then made a measurement on the tube and the bushing. Van’s calls for the bushing to be 1/64″ to 1/32″ longer than the bell crank tube. I used the scotch-brite whell and sand paper to get the length perfect. The bushings were a little tight inside the tube so I put the bushings in my drill press which I bought after checking various Drill Press Reviews and turned it on while using some 400 grit sandpaper to hone them down until they slid nicely into the tubes.

20140514-172458.jpg

20140514-172505.jpgNow I had to ream the inside diameter of the bushing to accept the 1/4″ bolt that goes through it. I just placed the bushing in my padded vise and used the reamer in my hand drill. It work pretty slick and the reamer just guides itself and is always centered.

20140514-172703.jpg

20140514-172723.jpgI then assembled the bell crank pieces that will hold the push rod from the bell crank to the aileron. For this I had to cut a spacer from some stock that they give you.

20140514-172933.jpgI bolted the bell cranks back into position on the spars but didn’t torque them as I’m not sure if I will have to remove them later. I had originally torqued and sealed the 2 brackets that the bell crank bolts to on the spar back when I was working on the spar but relieved that I needed to remove them to install the bolts for the bell cranks.

20140514-173323.jpg

20140514-173329.jpgWith those back on I moved my attention to mounting the ailerons. The ailerons are connected at 2 points on the wings, 1 bracket on each end. They use a combination of bolts, small washers, a large washer and a spacer similar to the bell cranks. The ailerons need a travel limiter, a physical stop so they don’t travel to far and cause damn he to them or the wing skins. Van’s has you make a small angle piece and rivet to the leading edge rib of the aileron. This angle will eventually hit the aileron bracket as it moves closer to its full travel. When it hits that’s the farthest the aileron will travel. My buddy Glen had a much better design that he used on his first RV-8 and repeated it on the one he is building now. What he did was transfer the contact point of the stop from the angle that’s on the rib to the spacer that’s in the bracket on the aileron. Clear as mud? Let me show you in pictures. Normally the stop would happen prior to the spacer hitting the bracket, around 1/8″ as you wouldn’t want just the spacer to be the limiter as it is just aluminum tubing. Glen used a piece of delrin tubing, it’s like plastic to me, and cut it to match the length of the spacer. He then reamed the inside so that the spacer would slide into it. Now when the aileron travels it will hit this new soft covering of the spacer and stop the movement. I first cut the space and made it perfect then I cut the delron tubing to match and reamed it to final size. I then assembled it all together as the plans show along with this new part.

20140514-174811.jpg

20140514-174804.jpg

20140514-174824.jpg

20140514-174817.jpg

20140514-174832.jpgThat white spacer will come in contact with the bracket on the spar and stop it’s travel. Glen said this work great and it was super easy to make and install. You can see in several of this photos the various washers and how tight they are. I bought a set of washer wrenches to help with inserting these. They are just thin stainless steel wrenches that have various sized ends that hold washers by spring pressure. You then can slide them into place and when the bolt is inserted pull on the wrench and they pop off.

20140514-175216.jpg

20140514-175222.jpg

20140514-175229.jpgAgain I didn’t torque any of these as I’m not sure if they will need to come off later. I then turned my attention to the push rods for the ailerons. There are 2 per side, one short steel one that goes from the bell crank to the aileron and a larger aluminum one that goes from the fuselage controls to the bell crank. I cut them with my pipe cutter to the length described on the plans. The shorter ones are cut to 23 13/16″ and the larger ones to 69 3/16″ for the RV-8. The plans give you call outs for several different models. Once cut I cleaned up the ends and the insides so that the rod ends would slide into them easily.

20140514-175835.jpg

20140514-175840.jpgI repeated this process for the larger tubes which were a little easier to cut since they are aluminum.

20140514-180027.jpgThe large rods get riveted to their ends by 6 rivets. 360° divided by 6 is 60° so I downloaded a protractor online and printed it so that I could create a template to make the rod ends.

20140514-182123.jpg

20140514-182128.jpg

20140514-182133.jpgI used the template to mark all 4 ends of the 2 rods and grabbed my jig I bought from Harbor Freight to drill them. After I bolted the jig down and made all the required adjustments I drilled 3 holes and went completely through the rod making all 6 holes. I started with a #40 bit and used my #30 reamer to enlarge the holes.

20140514-210503.jpg

20140514-210514.jpg

20140514-210520.jpg

20140514-210529.jpg

20140514-210535.jpg

20140514-210541.jpgI then moved on to the smaller rods in the same fashion. These just use 2 rivets per end at a 90° to each other. Since these are steel I sprayed a bunch of primer inside and rolled them around to get the entire inside covered.

20140514-210859.jpgThat’s where I decided to call it a night. I should have a few hours in the Hangar tomorrow.

Right Flap Done

Time: 3 Hours

I got home this afternoon from my 2 day trip and was anxious to get out into the Hangar. I repeated the entire process that I used on the left flap item for item. As with any task it always seems that the second task goes much quicker as you learn from the first one. This flap was no exception to that rule and I finished it in about half the time.

20140513-192745.jpg

20140513-192750.jpg

20140513-210525.jpgAnd that’s it! 2 flaps done and looking great!

20140513-210600.jpg