Elevator Riveting

Time: 6 Hours

Today’s items for the hangar were to rivet all the stiffeners to the skins as well as the trim servo plate. The servo plate was made possible as my tool order from Avery tools arrived. I needed a #6 dimple die to dimple the plate where the #6 screws will hold the plate on the elevator. All these parts get back riveted.

20130605-222555.jpg

20130605-222601.jpgHere you can see the trim servo plate support riveted in place. It has the 7 nut plates riveted to it for the #6 screws to attach. Notice the smaller heads of the NAS1097’s compared to the AN426 rivets.

20130605-222807.jpgI just laid the trim servo plate on it to see the fit. The support plate allows for the plate to sit flush with the skin. A perfect fit!

20130605-223016.jpgThe next step will be to bend(flatten) the trailing edge of the left and right elevators. For this you need a brake and Vans describes how to make one. I used 2×6’s, one 5′ long and the other a little shorter. Then hinges are screwed to combine the two boards.

20130605-223451.jpgThis creates a hinged press or brake.

20130605-223539.jpgI then removed the blue protective film on the inside of the skins as it will be hard to do that after the skin is flattened.

20130605-223714.jpgI have read that using a small dowel in the crease will help keep the radius as you squeeze. It worked pretty well on the rudder so I’m going to use it here.

20130605-223843.jpgI decided to secure the brake with some countersunk screws into my table.

20130605-223937.jpgThen you place the skin in the brake and use a couple clamps to give you leverage to squeeze.

20130605-224106.jpg

20130605-224112.jpgI was able to get about half way done but my clamps started slipping, so I stopped for the night and will get better pipe clamps tomorrow. Half way done and they look great, it just takes a lot of torque! and need a good clamp. Today was a great day in the hangar, I’m going to have to order the wings soon since I’m running out of aluminum. 🙂

More Elevator Work

Time: 5 Hours

Today was more work on the elevator stiffeners and the trim plates. First up was to edge finish and scuff all the stiffeners. Once that fun task is done I dimpled them to accept the dimples from the skins. There are 28 stiffeners that need to be done and my pneumatic squeezer makes quick work of this task.

Them they are off to be primed.

20130604-225402.jpgIn between the priming coats I stated to work on the trim plate. The rivets that hold the nut plates are NAS1097 which are small and have a very shallow head. So rather than dimpling I countersunk them very carefully by hand.

20130604-225728.jpg

20130604-225735.jpgNext was to dimple the skins.

20130604-230024.jpgThe DRDT machine makes quick work of both skins. I was pretty tired from today’s work but wanted to tackle one more project, the trim servo attach brackets. A few measurements from the plans and I had everything lined up and ready for drilling.

20130604-230947.jpg

20130604-230954.jpg

20130604-231001.jpgI will let the priming cure before riveting. All in all a good days work.

20130604-231135.jpg

Elevator Started

Time: 5 Hours

I’m waiting on rolling the leading edge of the rudder until I get help from my friend Glen when his schedule is open. So I started to work ahead on the elevator’s. The first items, like the rudder, it’s to form all the stiffeners. Not too hard when you use a bandsaw and scotch-brite wheel. I got both the left and right sides done.

20130602-211721.jpgNext was to match drill to the corresponding skins.

20130602-211818.jpg

20130602-211825.jpgI needed to order a couple dimple dies to use on the trim doubler plate that is in the L elevator. This plate allows for a recess for which the trim servo plate will sit allowing it to be flush with the skin. This plate will use screws to attach to the plate doubler. Those screws are a #6 and require a #6 dimple which I ordered tonight. I have plenty of work to do while waiting for those to arrive.

Riveting the Rudder

Time: 5 Hours

I had to fly a morning trip today which gave me the rest of the day to work in the hangar. First up was to rivet the substructure of the rudder. I started with the top rib that has the fiberglass attach strip riveted to it. I used my new 4″ no-hole yoke with my pneumatic squeezer.

20130528-204552.jpg

20130528-204559.jpgYou leave the last 3 rivets open so you can attach the skin at the same time.

20130528-204648.jpgThen I fit the counterbalance weight to the upper rib, I removed it to make it a little easier to move the rudder around while riveting.

20130528-204806.jpgNext was to rivet the rudder horn, horn support, spacer, bottom rib, doublers and the 3 nut plates.

20130528-205000.jpg

20130528-205009.jpg

20130528-205022.jpg

20130528-205036.jpg

20130528-205046.jpgOne smiley face today!

20130528-205138.jpgOnce the substructure was all done I added a “chewing gum” size blob of RTV(a silicone like material) to all the rudder stiffener trailing edge ends that are already attached to the skin. This is supposed to help alleviate any cracking on the skin from vibration. Then it was time to slide the skin over the structure.

20130528-205619.jpgThen I went around the rudder riveting the edge rivets. I used a couple different yokes and my gun/bucking bar to get all the rivets.

20130528-205827.jpg

20130528-205841.jpg

20130528-205849.jpg

20130528-205859.jpgThere were only 2 rivets that I just couldn’t get too, the last rivet on the leading edge, left and right, on the top of the rudder. There are several special tools that can get to these rivets but Vans allows you to use blind rivets and I figured there was no shame in using those. When filled they will look just like solid rivets after painted!

20130528-205833.jpg

20130528-210522.jpgA little touch up on several spots of the primer and that will be done. Next up… Bending the leading edge of the rudder. This is a tough job as you want a nice rounded leading edge and you can easily put a crease where the spar ends and that doesn’t look good. I will require the help from my resident pro builder, Glen.

Rudder Priming

Time: 4 hours

Today I spent the morning at St. Charles, IL to watch the Memorial Day parade and pay tribute to this who have served and those who are serving our country to keep us free. Their sacrifice and dedication is what allows me to do things like build my RV and for them I am truly thankful!

When I returned to the hangar I started the priming of the rudder substructure. I will get to rivet sometime this week after the primer cures.

20130527-163640.jpg

20130527-163635.jpg