Finished Forward Section Assembly

Time: 4 Hours

I got some time in the Hangar on Friday to assemble and rivet the forward section parts after the paint had cured for several days. First order was to clecko the upper/lower bulkheads in place followed by the baggage floor and side.

IMG_4103.JPG

IMG_4104.JPG

IMG_4105.JPGYou then add the firewall to the mix.

IMG_4106.JPG

IMG_4107.JPGOnce the firewall is in place clecko’d to the other parts you can final drill the holes that attach the firewall to the floor. There are 9 holes that need dimpling on the floor and countersunk on the firewall bottom brace(which I did earlier than the plans call for to make it easier). So I removed the firewall after drilling and dimpled the required holes. These holes will be riveted along with the cooling ramp later in the build.

IMG_4108.JPGWith that done I was now ready to rivet the firewall to the forward floor section. Before I could do this I needed to seal the area around those 9 holes I just discussed. This to prevent any migration of oils and such from the engine into the cockpit as they run along the cooling ramp to the belly of the airplane. To seal this you can just use Pro-Seal like the fuel tanks. So I taped off the area with electrical tape and mixed up some Pro-Seal for the job.

IMG_4109.JPG

IMG_4110.JPG

IMG_4111.JPGI then put the firewall back in place and checko’ed each of the 9 holes to allow the Pro-Seal to cure. I then riveted the remaining holes on either side of the sealed 9 holes.

IMG_4122.JPG

IMG_4115.JPG

IMG_4114.JPGAfter I was done with that assembly I sat back and was thinking ahead as I usually do to the next steps and trying to imagine future parts and sections. I was looking at my modification to the air supply pass thru I did to the lower forward bulkhead. I came to realize that my measurement for its location was off a little. I placed it to far towards the left as the view from the seat. What I found was that the 90° elbow would just clip the edge of one of my Cam-Locs! Here is a view looking forward and you can see the left edge of the pass thru is just on the right edge of the Cam-Loc.

IMG_4123.JPGSo that won’t work, I looked and looked for a solution on oh I would make this work. My solution? I just ordered a new lower bulkhead. It’s not riveted yet and I can replace the 6 nutplates on it. I will remove the pass thru and move it over about an inch which will give me clearance on the Cam-Loc and the support angle on the baggage floor. This is something I struggle with when doing these mods as you really have to think about every possible view of the part so as to avoid these errors. My problem was that these were two separate mods that ended up affecting each other. Luckily this will be an easy fix and only cost $26 for the part. But this is the fun part of the build is making these changes and mods to make it “my” airplane!

IMG_4125.JPG

IMG_4124.JPG

IMG_4127.JPG

IMG_4126.JPGOn the center section completion.

Center Section Starts

Time: 4 Hours

I was able to get some time in the Hangar tonight starting on the center section. This part of the fuselage is the mating section to the wing main spars. It comes from the factory precision matched to the spars I have and most if it is assembled and anodized. But there is some building and assembly that remains. You start with drilling the rudder cable pass thru holes in the web. You have to double check the plans as there are 2 different spots where to drill dependent on if you are going tail dragged or tricycle gear. Once I was happy with the read on the plans I marked the correct holes and drilled with my unibit.

IMG_4081.JPG

IMG_4080.JPG

IMG_4079.JPG

IMG_4082.JPGWorking with this section is like working with the main spars, you don’t want to screw up as these would be very expensive to replace and they are matched to each other already. I just read and read and read the plans before doing any work. Next steps were to create some seat belt spacers out if 5/16″ tubing.

IMG_4083.JPGI then debured the edges of the seat belt attach lugs.

IMG_4084.JPGThe forward flight control has a mounting bracket that gets attached to the forward side of the center section. You have to fabricate this out of some angle stock using the dimensions from the plans.

IMG_4085.JPG

IMG_4086.JPG

IMG_4087.JPGWith the one attach hole drilled in the bracket you can bolt it to the center section and match drill the other using the second hole already in the center section after squaring everything up.

IMG_4088.JPGOn both ends of the center section there are a forward and aft bulkhead. I needed to flute the flanges to get them to lay flat, just be sure to read the plans as there are certain spots that can’t be fluted and the flange must be flat.

IMG_4089.JPGYou can then bolt and clecko the forward bulkheads to match drill the 1/8″ holes.

IMG_4091.JPG

IMG_4090.JPGI did several other small tasks like match drill for several nutplates and countersunk for their rivets. That’s where I called it a night. I did look over the painted parts from this weekend and I’m still happy with their look. They should be ready for riveting this weekend.

Bulkhead/Baggage Floor Painting

Time: 4 Hours

Today started off with sanding down the Super-Fill to make the holes I accidentally drilled disappear. I then reprimed all the spots where I sanded.

IMG_4071.JPG

IMG_4072.JPGOnce the primer was dry I assembled all the parts for the baggage floor support and got them all riveted together.

IMG_4073.JPGI then put some masking tape in the Cam-Loc holes to keep them from getting primer/paint on them and then primed all the rivets I just did. A light sanding on all the surfaces followed up by cleaning the dust and using a tack cloth to remove any fibers from the rags I used to clean. I hung all the parts and got to painting. I have found that there are very subtle differences in the final color from can to can of the Rustoleum. So I have made some timing changes to my paint plans so that the 3rd and final coat on matching pieces will be from the same can. This will insure that parts that mate up together have the same coat from the same can reducing a noticeable difference in color. When parts are separated by even a couple of inches you can’t tell but right next to each other you can, sometimes!

IMG_4074.JPG

IMG_4076.JPG

IMG_4075.JPGAll in all I’m happy with my painting progress, there are some imperfections but I can live with those and think they look great. I’m really happy with the color! I will let these parts cure for 5 days or so and get to riveting them next weekend.

Bulkhead and Baggage Prep

Time: 6 Hours

I made some good progress today in prep for painting and assembly of the bulkheads and baggage area. I riveted the 2 support angles to the baggage floor, all the nutplates to the angles and lower bulkhead.

IMG_3967.JPG

IMG_3968.JPGIn this process I realized that I made a big error on my baggage floor prior to making the center cut for my modification. On the left side of the baggage floor, the farthest away from the baggage door, there are 4 screws that hold that end of the floor in place. These screws will go through the baggage floor and into nutplates on the floor support. I accidentally drilled the 2 wing holes for the nutplates, all 8 of them, through the nutplate wings and through the baggage floor! Oops those are for the rivets to hold the nutplates in place and if I riveted them through all the holes the screws would be useless and the floor would now be permanently installed. So now I have 8 holes that I don’t know what to do with. At breakfast today with the builders I was given and idea and told to come over to his shop. Super-Fil to the rescue! This is a epoxy filler, like bondo for cars. It will dry hard and will be easily sandable.

IMG_4069.JPGSo now that the day was saved with the Super-Fil I moved on to adding a 2″ pass thru flange for my cool air supply to the cockpit. There is a NACA vent on left side of the forward fuselage that will scoop air for the cockpit. This vent connects to a 2″ duct hose that goes to a eyeball vent on the dash. Van’s has you just hang the duct which doesn’t look that great. So I’m using a aluminum pass thru and eventually an elbow so that the duct hose won’t be seen and it will be hidden. I measured where I thought it should go and looked at my buddies as well. I cut the hole with a step bit and finished the rest with the dremel.

IMG_4068.JPG

IMG_4067.JPGSince the primer was dry on the upper bulkhead I started that riveting so I could paint tomorrow. First was the doubler followed by the single nutplate for the hinge pin and the 3 Cam-Loc’s.

IMG_4070.JPGI need to rivet all the baggage floor supports before I can paint but need to wait for the Super-Fil to dry and will get to it tomorrow. That’s all I can do today and will get back at it tomorrow.

Forward Baggage Floor

Time: 8 Hours

I got another full day in the Hangar working in another modification. The space between the firewall and forward bulkhead lies the forward baggage area. The floor is removable to give you access to several items like the rudder pedals, brake masters and several other things. The issue is that all the screws that hold down the floor are tough to get at within the small baggage area. To make this access a little easier I removed the center section of the floor and to make an easily removable access panel held down with Cam-Locs. To start I spent some time laying out the exact opening. I had to make sure I gave plenty of clearance for the different angles that support the floor. I also had to make room for the Cam-Locs and their parts. Once I was sure I had everything all laid out correctly I got the dremel out and cut the opening.

IMG_3956.JPG

IMG_3958.JPG

IMG_3957.JPGI then spent an hour or so straightening all the edges with a couple of files and sand paper. Last week I had ordered some sheet stock so that I could make the panel for this mod. I laid it out and put the cut out frame of the baggage floor on it to trace the opening.

IMG_3959.JPGOnce I got the rough shape cut out I moved towards building the ledge that the panel will sit on. I used some .040 sheet to fabricate several strips 1.25″ wide. I cut them to length and laid out a rivet line keeping all the spacing correct and watching the edge distances. With a bunch of clamps I was able to drill all the holes and clecko them.

IMG_3960.JPG

IMG_3961.JPGSince the floor was modified I had to cut down the floor stiffeners.

IMG_3962.JPGNow that the stiffeners were in place that made it easier to place the floor panel in place and remove it so that I could get the final shape perfect. I made several light passes on the Scotch-Brite wheel and kept checking the fit. It took a little while but I got the fit just right. With the new panel in place I clamped it down so that I could work on the Cam-Loc locations. I came up with a good layout for all 10. I then drilled a 15/64″ hole at each spot and followed that up with my 1/4″ reamer to get them to the final size. I then removed the panel and placed all the Cam-Loc studs in the holes in the support ledge, normally they would go in the panel, but I used them to hold the receptacles in place.

IMG_3963.JPGAs those were being held in position I was able to drill all the rivet holes for them. I then replaced the studs in the panel and used them to hold the panel to the substructure since the receptacles are not riveted yet and clecko’s would get in the way. Here is how it all looked when finished.

IMG_3966.JPG

IMG_3964.JPG

IMG_3965.JPGI finished up the day by dimpling all the required holes and prepping for primer. Should get a lot done this weekend.