HS Skins

Time: 4 Hours
Got a little work done in the Hangar today. Worked on deburring all the holes on both the left and right side HS skins. Then I treated the areas that will be dimpled with the Scotch-Brite pad. Next up was to use the DRDT-2 machine to dimple every hole in the shins, top and bottom. Tomorrow I will do some final Scotch-Brite work on all the pieces and maybe get some priming done.

20130329-213030.jpg

20130329-213040.jpg

20130329-213136.jpg

20130329-213145.jpg

Dimpling

Time: 3 Hours
Today I was able to get all the substructure of the HS dimpled. That’s the process of creating a dent around the hole so that a flat rivet will sit flush. The skins will have a dimple as well. The dimple creates a pimple of sorts on the underside of the metal. That pimple needs a place to sit in so that the two pieces sit flush with each other. So the substructure, like the flanges on the ribs, need a dimple to accept the pimple of the skin that will be mated to it. To do this process you use a set of dies, one female and one male, that shape the metal into the dimple.

20130328-184308.jpg
For all the ribs and spars I used my pneumatic squeezer with the correct set of dies. This tool makes quick work of this job.

20130328-184546.jpg
For really tights spots, like the nose of some ribs, I used a set of dies that uses a nail and the pull rivet tool.

20130328-184731.jpg
Next up was the job of removing the blue protective plastic from the areas of the skins that have the holes so that I can dimple and eventually rivet them.

20130328-184911.jpg

20130328-185004.jpg
Next up will be deburring every hole, top, bottom, inside and out, on both skins. Once that is accomplished I will dimple the skins with my DRDT-2 machine. I set up the DRDT-2 and the table I made for it and clamped it to my workbench. It will be all ready for me tomorrow after all the deburring is done.

20130328-203102.jpg

20130328-203128.jpg

Right HS Skin

Time: 5 Hours
Yesterday I got in around 5 hours in the Hangar. First up was to tackle the dreaded HS-405, HS-702 & HS-404 junction drilling. I spoke about this earlier and how many builders end up with edge distance problems. Usually this distance is ok according to Van’s Aircraft tech support. I had to wait until my 12″ #30 and #40 drill bits got in at Grainger. Then I measured and marked the aft flange of HS-404 and drilled away. Those went very well drilling from forward to aft.

20130328-130347.jpgbr />
20130328-130544.jpg
I then used the same bits to drill from aft to forward on the two outer holes. These also included the HS-810, HS-814 stiffeners in the drill group. All in all I was happy with this task, thankfully I learned a lot from other builders mistakes.

20130328-125855.jpg
Then I was off and running repeating everything I had just finished on the right half of the HS. <

Left HS Skin

Time: 4 Hours
I was able to build up the substructure for the left half of the HS. This included match drilling all the connections.

20130324-162957.jpg
Next up was wrapping that structure with the skin. This includes a lot of Cleko’s. I’m sure glad I invested in a pneumatic Cleko gun. That tool saves a lot of time vs the hand pliers.

20130324-163243.jpg
Next up was to insert the middle rib, HS-405 and the forward rib, HS-404. These are then marked so that you can drill them using the skin as a guide. This went fast and wasn’t too hard. However I may have an issue with edge distance on the forward upper and lower flange on HS-405. I will consult with the pros tomorrow and see what they think.

20130324-163721.jpg

20130324-163732.jpg

20130324-163742.jpg
You can see the area I’m concerned about in this photo. It is the edge distance on the bottom and left to right (aft to forward).

20130324-163942.jpg
Overall I’m happy with my progress today! Here is the results:

20130324-164036.jpg