Floor Mod Finished

Time: 4 Hours

I finished up the seat floor mods today by making the two panel doors. I used some .025 sheet, the skins for my wings that got damaged in the shipment way back at the beginning of the wing build. I removed al the substructure parts from the seat floor so that I could lay the floor on the sheet and trace the opening. I then took my time cutting and cleaning up the edges to get a good fit. Once I was happy with the fit I tapped them in place so I could drill the hinge.  

     

I then grabbed all of the support angles and cleckoed them in place for final drilling.  

 There are 3 support angles that would go across the area that I put the access panels. I needed to cut them down so they would now fit on just the doors.  

   I cut them down and cleaned up all the edges.  

   I debuted all the new holes and cleaned up shop for the night. Not a bad Monday in the Hangar. 

Seat Floor Mod

Time: 12 Hours

One of the maintenance mods that I wanted to do involved the seat floors.  The seat floors will get riveted permanently later in the build some builders have made the floors removable by adding a lot of nutplates where rivets would go. I did a lot of researching to decide if I wanted to go that route or not. What I decided was that all that extra work was not worth it for me. What I did decide to do was make to accres panels in the center section of the floors and copy my buddy Glen’s work. The center bay just aft of the passenger foot well is a perfect place to put the com antennas. These bays will and be a good spot to put wire terminal blocks for the wings so that removal of the wings(should that ever be required) will be a little easier when it comes to the wings wiring. I spent several hours just laying out the hole and measuring all the specs so that nothing was going to interfere with other parts. I used Glen’s photos to help give me an idea of how I wanted to lay it out.  In this mod the hinge will sit a little proud of the floor as well as the CamLoc that I will use to secure the door but all of this will be covered with a carpet kit from Flight Line interiors. 

       The rest of the time I carefully measured and cut all the required pieces. I always struggle with this type of work as I have a hard time looking ahead several steps to see potential problems or issues. The only one I ended up having was an edge distance issue with the floor side hinge at both ends as I had forgot to add the 1/4″ lip to my rivet spacing. Not a big deal as the hinge is sandwiched between the floor and a piece of angle. I didn’t take a lot of pictures as I went but here are a few.  

   Over all I really pleased with how the hole and substructure for both sides came out.  

 I decided to stop with that work as all I have to do is make the doors and match drill the support angle holes that would have been there in the first place. I also received my heater valve from Aircraft Spruce on Friday and decided to put it into position. It comes with a heat temp sealant to put around the opening to prevent any leaking.  

       All in all a great weekend in the Hangar even though there wasn’t a whole lot to show for it. I used up all of my 3/4″ thin angle I had ordered from Van’s as I had a few bad cuts and wasted some of it. I will order more since I have anothe rear baggage mod to do as well as the oil can issue on the aft bottom fuselage that needs attention. 

Seat & Rear Baggage Floors

Time: 5 Hours

Yesterday I spent part of the afternoon working in the seat/rear baggage floors. This consisted of a lot of edge deburring on all the parts including then passenger foot wells.  

  

I also woked the edges of the rear baggage area bulkhead cap. This will close of the agave area from the rest of the tail cone.  

I placed the floors in place so could match drill al the holes.  

  

  

  

 I then grabbed the rear control stick mounting support and placed the two forward bolts in place so I could match drill the aft two bolt.  I then removed the bracket and drilled those new holes for nutplates.  

The last thing I did for the day was to start the work on the flap control arm end blocks. These plastic pieces are used to hold the arm in place but also act as a smooth hinge so the arm can rotate easily. You need to trim the corner a little to allow them to sit tight in the corners.  I have read where some builders have had issues with edge distance while drilling down through the blocks into the ribs below.   I will do a little extra measuring before I do that task. I placed the blocks and the arm in place to see how they looked before calling it a day.  

  

Another good day in the Hangar! 

Front Seat Support Bar

Time: 6 Hours

Today I ran to Home Depot to grab a 36″ Dewalt clamp to help spread the fuselage sides apart so I could get the support bar in place. This bar will support the pilots seat back and provide structure to the top of the fuselage sides. When I returned home I used a couple small pieces of wood as spacers and put the clamp in place after reversing the ends so it would be a spreader. This was all so I didn’t scratch the paint as I slid it up into position since it is a tight fit. I had to do a little prying to get it up into position along with the two spacers but didn’t cause any damage to the paint. Once the bar was in place I removed the clamp and returned the ends to the clamp position. I then put the clamp on the upper edge of the sides to now squeeze the skins, longeron and bar all together to get the holes to line up. I first started with the 8 vertical screws and their washer/nuts. I held the Philips head still and tightened the nut so the screw head wouldn’t tear the paint. I then followed those up with the solid rivets. I used several of my pneumatic squeezer yokes to get all but 3 rivets per side. On one rivet I used my small mushroom head in the rivet gun and my small thin bucking bar. The last two rivets are all but impossible to get too with any type of bucking bar and Van’s calls for CS4-4 flush blind rivets. All these turned out perfect and no damage to the paint.

  

I then put in the 16 AN3-4 bolts that are on the sides. I will say these took me forever to get as the 4 inboard ones are in a tight space and the top outboard ones don’t have a lot of room to run an open end wrench.

   I took time in between the bolts and riveted the hinge to the pilot seat back.

After I finished up the bolts I finished riveting the passenger seat back. It went pretty quick with the rivet gun and tungsten bucking bar. As with the pilot seat back I left the hinge off so I could paint first.

   The bar looks pretty good in place!

 To protect the bar and side rails I bought some packing pad and tape to wrap those areas.

Long day for not a whole lot of items but it was a good day! Next up the seat floors and passenger foot wells.

Seat Backs and Cockpit Rails

Time: 8 Hours

Today started with work on the passenger seat back. There was a lot of edges that needed deburring including all the relief notches.

    

  

I scuffed, cleaned and primed all these parts.

In between the priming coats I got to work riveting the pilot seat back. I did not rivet the bottom support angle as it also gets riveted to the hinge and I didn’t want to paint the hinge. I will paint those two parts separately and then rivet those parts together.

So I still had time to kill between priming so I started looking at the cockpit rails and how the riveting would go. I grabbed several of my pneumatic squeezer yokes and started mocking up the process. I felt like I had a pretty good plan for the process and decided to start this task. I carefully clecko’d the rails in place so that I didn’t scratch the paint. I then placed painters tape on the areas where I thought I might scratch the edges. I also used back riveting tape over the rivet heads so the squeezer dies wouldn’t scratch the paint.

I started with the rivets over the center section bulkheads. I worked on the left side then the right as I had the squeezer set for the specific length rivets.

I worked my way down the length of the rails taking my time so I didn’t scratch any areas.

      

They all turned out perfect! Hopefully I can keep them looking as good for the rest of the build. I will put some type of padding on these and tape them down to protect them. I then grabbed the seat back support bar plates and clecko’d them in place. I had to think about how I would get to the backs of these rivets as the space towards the top of the brackets is pretty tight. To get the right angle for my hand and my tungsten bucking bar I needed to be inside the fuselage. I grabbed a scrape piece of wood to make a seat across the floor ribs and put all the tools inside for me to reach. I then climbed in and got into position. It wasn’t easy but I was able to get al of them done. I did chip the paint on the right side a little and will have to do some touch up work later.

  

I finished the priming on the passenger seat back and started the riveting.

I did as much as I could with the squeezer and stopped since it was late and the rest of the rivets need the rivet gun and bucking bar. I grabbed the pilot seat back and hung the parts on the rack and painted them for the last task of the day.

Another good day in the Hangar!