New Firewall Work

Time: 6 Hours

The new firewall arrived last Saturday in prompt fashion from FedEx all crated up and secure from Van’s. Unfortunately, for the build, I had a very busy flight schedule this week flying all 5 days with a couple of overnights in there. That put a pause on the work in the Hangar for the week but I got back at it today. First up was to un-crate the firewall and get to deburring.

IMG_4540.JPG

IMG_4541.JPGWhat I did get done last week I between flying was to touch up the paint on the parts that I removed from the damaged firewall.

IMG_4617.JPGI finished deburring all the edges using a file and sandpaper, man this stainless steel is sharp!

IMG_4618.JPGI then final drilled all the holes to their final sizes, this was done in conjunction with the other parts on the first firewall. After that I grabbed the DRDT dimpling machine and dimpled all the required holes. With all that work done I clecko’ed the substructure pars to the firewall for riveting.

IMG_4619.JPGAs before the best way to rivet these parts is with the back rivet set.

IMG_4620.JPGSince I left the bottom support in the forward floor I left all those rivets out as well as both of the bottom engine mounts. This allowed me to slide the firewall back into position.

IMG_4622.JPG

IMG_4623.JPGI was then able to get the remaining rivets with the bucking bar and gun.

IMG_4625.JPGThen it was just a matter of returning all the parts I removed to get at the firewall.

IMG_4624.JPG

IMG_4626.JPG

IMG_4627.JPG

IMG_4628.JPG

IMG_4629.JPG

IMG_4630.JPG

IMG_4633.JPG

IMG_4632.JPG

IMG_4631.JPGSo I’m back in business and moving forward again. You might notice that the firewall is no longer resting on the table and is elevated about an inch or so with a couple pieces of 1″x4″ under the gear towers so this doesn’t happen again! Overall this mistake has cost me 10 hours of extra work, not as bad as I was figuring but I don’t want to do it again.

Renewed Energy

Time: 4 Hours

This last week I traveled to Orlando, Florida to attend the NBAA (National Business Aviation Association) annual convention. This is the largest aviation convention in the world and the 7th largest overall convention.

IMG_4499.JPGI attended various classes on several different topics including weather advances and fatigue management. Along with classes, seminars and presentations there is also a very large static display at the airport showing all the latest and greatest business aircraft.

IMG_4518.JPGAnother thing the week did was to give me some down time away from the RV-8 build and Hangar to regroup and renew my build spirit after the huge mistake I made last week. So I had the new drive and ordered a new firewall and had it shipped for an arrival this weekend. So after running all the errands this morning I got in the Hangar to start the big job of disassembling the firewall.

IMG_4525.JPG

IMG_4526.JPG

IMG_4527.JPGIf you remember all the parts on the firewall were riveted to it first before being riveted and ProSealed to the forward floor. I decided to leave the bottom support of the firewall attached to the forward floor so I don’t have to remove the old ProSeal. I looked at all the rivets and think I can get to them after the firewall is placed back into its position. So that row of rivets was the first up on the drill out schedule.

IMG_4529.JPG

IMG_4530.JPG

IMG_4528.JPG

IMG_4537.JPG

IMG_4536.JPGSo now that the firewall was off the forward floor I put it on the workbench and started the drilling. I worked on one side and then the other so I could keep the parts organized. I drilled just deep enough so I could snap off the head and used the auto punch to pop out the shaft. All worked pretty good and I only had a few enlarged holes.

IMG_4532.JPG

IMG_4531.JPG

IMG_4533.JPGSo all I have left to drill out are the 2 horizontal supports along with the various nutplates in them. I have an EAA chapter meeting tonight so that’s where I quit for the day.

IMG_4534.JPG

IMG_4535.JPGOnce I have all the parts off I will do some sanding and cleaning of the parts and put a fresh coat of paint on them. Hopefully the new firewall will arrive tomorrow and I can get to work finishing the edges and holes along with dimpling.

Highs and Lows

Time: 4 Hours

Today started out really good with being able to sleep in for a coupe extra hours which was really nice. The first task for the day was to get the Harley prepped for its winter siesta. Some minor task like getting the battery ready for removal so I could keep it trickle charged over the winter. I got my trailer loaded on the truck and loaded it up. An hour later I had it safely tucked away at our work hangar and covered for protection. When I got back home and in the Hangar my goal was to design and build the new workbench for the fuselage. After several drawings and measurements I decided on 24″ high, 36″ wide and 7′ long. So off I went on the build.

IMG_4481.JPG

IMG_4480.JPGI put a 3/4″ plywood top on it along with some cheap carpet I got on clearance at Home Depot. Now how to get the fuselage from the higher table to the lower one. I figured on a way to slide the fuselage forward after lining up the two tables. All went well until the last 5″ of the slide. I had the fuselage on the new bench and all was well except I wanted to slide if forward 5 more inches. That’s where I really screwed up. While pushing from the back the lower two tabs of the firewall caught on the carpet and bent aft as I slid forward. I noticed this after walking around to check if I slid it forward enough. Ugh! I sighed and worked to bend them back to their normal position.

IMG_4482.JPG

IMG_4483.JPGWow those look bad! No cracks but look bad. I texted my friend and expressed how stupid I was. He said they look bad and the best course of action might be to replace the firewall. I knew that was the answer I would get. I’m so deflated right now. That job will be a big one as all the previous work would have to be undone and new parts ordered. So lots of time and money will be needed to fix this 5″ and 5 second error. I’m hoping that maybe its can just be a cosmetic error and be able to leave it as is. Right now I feel like shelving this build! How could I make a simple stupid mistake so easy? I’m not sure but I did and now I will have to figure a way out. So here it sits until I figure it out.

IMG_4484.JPG

Back to Work

Time: 4 Hours

I had a nice 6 month training event at Flight Safety which is always a fun challenge. It always amazes me at the scenarios that the instructors can put you through this fun little box.

IMG_4373.JPGAfter training was through I drove up to Las Vegas to meet up with my girl was there on a business trip. We had a lot of fun on this long weekend, we also got to catch the Red Bull air races while we were there.

IMG_4443.JPG

IMG_4413.JPGWhen I got home I had a lot of errands and stuff to do since I was gone for 8 days. However I did manage to get 4 hours in the Hangar. I decided to wait on the fuselage aft bulkheads and work on the panel bulkhead that I had messed up and reordered the part for. If you remember the lower bulkhead had a 2″ passthrough that I added to help clean up the look. When I measured for the placement I didn’t take into account the parts for the mod I did on the baggage floor. The placement put the pipe, and it’s 90° elbow, hitting the edge of one of the CamLo’s in the baggage floor. So I did some new measurements and got to work on it. Not a lot to show as it was just as I did before. Here you can see the placement of the error and the new one.

IMG_4458.JPGI replaced the passthrough along with new nutplates and primed/painted the parts. I will reinstall it after it cures for a few day.

IMG_4459.JPGMy goal for this weekend is to winterize my Harley and get it put in storage. That will give me room to build a new stationary workbench that will be 2′ off the ground. This will hold the fuselage at a better working height as it grows. It will also free up the rolling workbench for work space.

IMG_4467.JPG

More Deburring

Time: 4 Hours

I got home from my trip this afternoon and took care of some errands before getting back in the Hangar. The first items up were to match drill all the bulkheads, arm rests and gussets. I was then able to combine the forward floor section, center section and mid fuselage.

IMG_4351-1.JPG

IMG_4353-1.JPG

IMG_4352-1.JPGI then grabbed the two forward skins and removed the blue film from the inside for eventual priming and painting. I then grabbed the soldering iron and removed the blue film over the rivet lines.

IMG_4355.JPG

IMG_4354.JPGI then got to the deburring of all the edges and punched holes. With all the edges nice I put them in their place on the fuselage. The plans call for a lot of clecko’s to hold everything in proper place.

IMG_4358.JPG

IMG_4359.JPG

IMG_4360.JPG

IMG_4361.JPGI have run out of 1/8″ clecko’s and need to order more this week while I’m in flight training. The last thing I did today was to add several side support angles on the side skins. Next up the aft tail cone and all its bulkheads.